Gallery
Consultation
Design
Installation
Follow up service
Tips
Complete Kitchen Renovation
Home
AboutOur ClientsContact

Marcon Design

First Draft
Marcon's kitchen designer is responsible for doing the drafting work for the entire design of your new kitchen. She will do both a layout drawing, which is a bird's eye view, and an elevation drawing. During the first meeting onsite she will gather all the information required and do an initial rough drawing as a preliminary to doing the final design.

Continuing the Process
Every step of the process is patiently micromanaged by one of the experienced Marcon staff so that each step in the renovation is in proper sequence. From the moment you walk through the door to the moment you stand in your finished kitchen, they want no mistakes. Part of their consultation includes an explanation of the various costs involved and how to keep the whole project within your budget. They will help you make informed choices and offer referrals to contractors, consultants and suppliers if desired.

Pricing.
Included in your overall budget are several distinct categories. They are costs for the appliances, the contractor, kitchen installation, fixtures, floors and countertops.

  1. The clients choose the appliances so that the cabinets and the rest of the kitchen structural work can be accurately measured and designed. This information is an important part of the first meeting in the home so the contractor can evaluate the extent of the electrical or plumbing work needed. The clients may choose their own supplier or if they prefer, visit an appliance dealer recommended by the staff at Marcon.
     
  2. The contractor is responsible for an accurate pricing of all structural aspects of the renovation. Included in his costs are new sub floors, plumbing, drywall, fan vents, electrical wiring, etc.
     
  3. Kitchen fixtures such as sinks, faucets, floor tile and backsplash tile are all available through Marcon Bath Studio. For the granite or corian countertops and lighting fixtures, Marcon can recommend reliable suppliers.
     
  4. Finally, Marcon is responsible for pricing the design and for building and installing the kitchen cabinets. Your cabinets will usually be ready six weeks after ordering.

With their knowledge and attention to detail, you can relax knowing you are in good hands.
 

"At Marcon we make it personal!"

Gallery
Marcon Kitchen and Bath
Powered by IMAGE BANK Multimedia Inc.